Transparent Post-Construction Cleaning Rates for St. Louis
Post-construction cleaning in St. Louis is billed by the hour, not per square foot: $75 per hour per cleaner, 3-hour minimum ($225 for one cleaner; a two-person team is double, $450).
From luxury builds in Ladue to commercial projects in Clayton and mixed-use developments in Chesterfield—our pricing starts with square footage, how much dust and debris is left, which stages you need, and a COI when you need one. Those decide the hours; the hourly rate does not change.
Quick Wipe-Down vs. Full Detail Clean
The difference between "looks clean" and a detail clean of the items on your checklist.
Quick surface wipe-down. Looks clean in photos.
- One fast pass leaves fine dust on ledges and trim
- Dust in the air settles back onto "clean" surfaces
- Vent covers skipped, so dust keeps showing up
- Buyer notices dust soon after move-in
Top-to-bottom passes that clear the dust.
- Thorough vacuuming plus wiping down reachable surfaces
- A final pass after the dust has settled
- Vent covers wiped down
- Final walkthrough before handoff
How We Price Post-Construction Cleaning
- $75 per hour, per cleaner
- 3-hour minimum ($225 for one cleaner)
- Two-person team: double the rate ($450 minimum)
Square footage, dust level and the stages you need decide how many hours the job takes. We give you an hour estimate before work starts.
Request Exact Quote
Rough, Detail, Final: Where Your Money Goes
Each stage has a purpose: a rough clean, a detail clean, and a final touch-up before handoff.
During Construction
Rough Clean
Debris removal while work is ongoing. Keeps site workable for next trades.
Checklist:
- Remove large debris & construction waste
- Sweep/vacuum floors and open areas (shop vac level)
- Wipe down fixtures & appliances
- Clear pathways for next trades
- Haul away trash and recyclables
Cost Allocation
Typically 30% of total project cost
After Fixtures Installed
Detail Clean
Careful removal of fine dust from ledges, trim, vents and fixtures. The stage that makes the biggest difference.
Checklist:
- Deep-vacuum from ceiling to floor
- Clean all interior windows & glass
- Detail fixtures, hardware, switch plates
- Remove construction film, labels, stickers
- Wet-wipe all horizontal surfaces
- Clean inside cabinets & closets
Cost Allocation
Typically 50% of total project cost
Before Inspection/Walkthrough
Final Punch
A careful last look and touch-up. The standard your buyer expects.
Checklist:
- Multi-angle light inspection (natural + artificial)
- Touch test all horizontal surfaces
- Touch-up any missed areas
- Final dusting pass
- Polish fixtures and hardware to a handoff-ready finish
Cost Allocation
Typically 20% of total project cost
Post Construction Cleaning Pricing Factors
Common questions about our rates and what affects pricing
How much does post-construction cleaning cost per square foot?
We do not charge per square foot. Post-construction cleaning is billed at $75 per hour per cleaner, 3-hour minimum ($225 for one cleaner; a two-person team is double, $450). Square footage and dust level drive how many hours the job takes, and we give you an hour estimate before work starts.
Why is post-construction cleaning more expensive than regular cleaning?
Post-construction cleaning takes much longer than a regular clean. Fine construction dust settles on ledges, trim, vents and fixtures, and it often takes more than one pass to clear. New finishes also need extra care so grit doesn't scratch them. You're paying for the time it takes to do the job thoroughly.
Is there a surcharge for heavy drywall dust?
Heavy drywall dust does not change the hourly rate, but it adds hours. Drywall dust is extremely fine and pervasive—it settles into HVAC systems, gets behind outlets, and coats floors, ledges and fixtures. Clearing it takes multiple passes, wiping down reachable surfaces, and extra time on vent covers. We look at dust levels when we estimate the hours.
How do you charge for post-construction cleaning?
We estimate hours based on: square footage, construction type (new build vs renovation), dust severity (light, moderate, heavy), stages required (rough, detail, final), and timeline urgency. Those decide the hours; we bill by the hour per cleaner and give you an hour estimate after our walkthrough.
How to Remove Construction Dust Permanently
Fine construction dust keeps settling for a while after the work stops, so a single quick pass leaves a film behind. We work top to bottom and finish with a final touch-up pass.
Top to Bottom
We start up high and work down, so dust falls where it can be picked up instead of landing on surfaces we already cleaned.
Ledges, Trim and Fixtures
Post-construction dust cleared from ledges, trim, vents and fixtures, not just the open floor.
Plain Stages
Rough clean, detail clean and final touch-up. The last pass catches the fine dust that settles after the first round.
Industry Resources
Learn more about water management and home maintenance best practices.
Ready for a Quote?
See our hourly rates above, or contact us for an hour estimate on your specific project.