Transparent Pricing

Transparent Post-Construction Cleaning Rates for St. Louis

Post-construction cleaning in St. Louis is billed by the hour, not per square foot: $75 per hour per cleaner, 3-hour minimum ($225 for one cleaner; a two-person team is double, $450).

From luxury builds in Ladue to commercial projects in Clayton and mixed-use developments in Chesterfield—our pricing starts with square footage, how much dust and debris is left, which stages you need, and a COI when you need one. Those decide the hours; the hourly rate does not change.

Quick Wipe-Down vs. Full Detail Clean

The difference between "looks clean" and a detail clean of the items on your checklist.

Quick Wipe-Down
One pass

Quick surface wipe-down. Looks clean in photos.

  • One fast pass leaves fine dust on ledges and trim
  • Dust in the air settles back onto "clean" surfaces
  • Vent covers skipped, so dust keeps showing up
  • Buyer notices dust soon after move-in
Full Detail Clean
$75/hr per cleaner

Top-to-bottom passes that clear the dust.

  • Thorough vacuuming plus wiping down reachable surfaces
  • A final pass after the dust has settled
  • Vent covers wiped down
  • Final walkthrough before handoff

How We Price Post-Construction Cleaning

  • $75 per hour, per cleaner
  • 3-hour minimum ($225 for one cleaner)
  • Two-person team: double the rate ($450 minimum)

Square footage, dust level and the stages you need decide how many hours the job takes. We give you an hour estimate before work starts.

Request Exact Quote

We'll respond via email within 24 hours. No spam, ever.

Rough, Detail, Final: Where Your Money Goes

Each stage has a purpose: a rough clean, a detail clean, and a final touch-up before handoff.

1

During Construction

Rough Clean

Debris removal while work is ongoing. Keeps site workable for next trades.

Checklist:

  • Remove large debris & construction waste
  • Sweep/vacuum floors and open areas (shop vac level)
  • Wipe down fixtures & appliances
  • Clear pathways for next trades
  • Haul away trash and recyclables

Cost Allocation

Typically 30% of total project cost

2

After Fixtures Installed

Detail Clean

Careful removal of fine dust from ledges, trim, vents and fixtures. The stage that makes the biggest difference.

Checklist:

  • Deep-vacuum from ceiling to floor
  • Clean all interior windows & glass
  • Detail fixtures, hardware, switch plates
  • Remove construction film, labels, stickers
  • Wet-wipe all horizontal surfaces
  • Clean inside cabinets & closets

Cost Allocation

Typically 50% of total project cost

3

Before Inspection/Walkthrough

Final Punch

A careful last look and touch-up. The standard your buyer expects.

Checklist:

  • Multi-angle light inspection (natural + artificial)
  • Touch test all horizontal surfaces
  • Touch-up any missed areas
  • Final dusting pass
  • Polish fixtures and hardware to a handoff-ready finish

Cost Allocation

Typically 20% of total project cost

Post Construction Cleaning Pricing Factors

Common questions about our rates and what affects pricing

How much does post-construction cleaning cost per square foot?

We do not charge per square foot. Post-construction cleaning is billed at $75 per hour per cleaner, 3-hour minimum ($225 for one cleaner; a two-person team is double, $450). Square footage and dust level drive how many hours the job takes, and we give you an hour estimate before work starts.

Why is post-construction cleaning more expensive than regular cleaning?

Post-construction cleaning takes much longer than a regular clean. Fine construction dust settles on ledges, trim, vents and fixtures, and it often takes more than one pass to clear. New finishes also need extra care so grit doesn't scratch them. You're paying for the time it takes to do the job thoroughly.

Is there a surcharge for heavy drywall dust?

Heavy drywall dust does not change the hourly rate, but it adds hours. Drywall dust is extremely fine and pervasive—it settles into HVAC systems, gets behind outlets, and coats floors, ledges and fixtures. Clearing it takes multiple passes, wiping down reachable surfaces, and extra time on vent covers. We look at dust levels when we estimate the hours.

How do you charge for post-construction cleaning?

We estimate hours based on: square footage, construction type (new build vs renovation), dust severity (light, moderate, heavy), stages required (rough, detail, final), and timeline urgency. Those decide the hours; we bill by the hour per cleaner and give you an hour estimate after our walkthrough.

The Science

How to Remove Construction Dust Permanently

Fine construction dust keeps settling for a while after the work stops, so a single quick pass leaves a film behind. We work top to bottom and finish with a final touch-up pass.

Top to Bottom

We start up high and work down, so dust falls where it can be picked up instead of landing on surfaces we already cleaned.

Ledges, Trim and Fixtures

Post-construction dust cleared from ledges, trim, vents and fixtures, not just the open floor.

Plain Stages

Rough clean, detail clean and final touch-up. The last pass catches the fine dust that settles after the first round.

Ready for a Quote?

See our hourly rates above, or contact us for an hour estimate on your specific project.

Family-owned in St. Louis$2M general liability insurance
Check Availability